A 500 t/d gold ore processing project at a gold mine in Zimbabwe

A 500 t/d gold ore processing project at a gold mine in Zimbabwe
发布时间: 2026-01-13
  • Industry:
  • Region:Zimbabwe
Customer Case Details

The gold mine in Zimbabwe has a relatively high gold grade in the raw ore, reaching 6 g/t. During the project implementation, comprehensive planning, rational layout, environmental protection, and safe production were prioritized. The construction period was strictly controlled, and high-quality services covering the entire mining industry value chain (EPC+M+O) were provided to the client.
The process flow includes: single-stage grinding - two-stage classification in a closed-circuit grinding system - gravity separation - cyanidation - desorption and electrolysis - smelting - tailings dewatering.


A 500 t/d gold ore processing project at a gold mine in Zimbabwe

Our manufacturer has conducted customer cases in the mining industry in multiple countries around the world. For detailed information on the industry, location, production capacity, equipment configuration, etc. of the cases, please feel free to consult us at any time.
best-selling machine
CTS Series Perm-magnetic Roller
output:10-280t/h
Feed size:/
Motor power:3-30kw
CTBSeries Perm-magnetic Roller S
output:10-280t/h
Feed size:/
Motor power:3-30kw
SF-type Flotation Machine
output:0.6-46m³/min
Feed size:/
Motor power:5.5-90kw
Vibrating Screen
output:20-750t/h
Feed size:/
Motor power:5.5-30kw
Online
Whatsapp