bbn home case

1500t/d Lithium Ore Beneficiation Project

1500t/d Lithium Ore Beneficiation Project
发布时间: 2026-01-13
  • Industry:
  • Region:sichuan
Customer Case Details

This project is designed to process 1500 tons of lithium ore per day, targeting the efficient recovery of lithium minerals (such as spodumene or lepidolite). The flowsheet typically includes crushing, grinding, gravity separation, flotation, and concentrate dewatering stages. Advanced separation techniques—such as dense medium separation or multi-stage flotation—are often applied to achieve high-grade lithium concentrate. The final concentrate is filtered and dried for shipment, while tailings are managed through filtration or pumping to a storage facility. The plant emphasizes energy efficiency, water recycling, and automation for sustainable and cost-effective operation.



Our manufacturer has conducted customer cases in the mining industry in multiple countries around the world. For detailed information on the industry, location, production capacity, equipment configuration, etc. of the cases, please feel free to consult us at any time.
best-selling machine
CTS Series Perm-magnetic Roller
output:10-280t/h
Feed size:/
Motor power:3-30kw
CTBSeries Perm-magnetic Roller S
output:10-280t/h
Feed size:/
Motor power:3-30kw
SF-type Flotation Machine
output:0.6-46m³/min
Feed size:/
Motor power:5.5-90kw
Vibrating Screen
output:20-750t/h
Feed size:/
Motor power:5.5-30kw
Online
Whatsapp